Do you know what is in the concrete you are about to cut or drill into?
One Contractor thought he did and cut the PT cable.
Why X-Ray?
Best Method for inspecting concrete
Easy to identify inclusions
Up to 16“ slab, depending on concrete density
Film developed on-site
Results are immediate
Suspended Slabs, CMU, and Concrete Walls
X-Ray Process
Upon arrival to site we do a complete walk through of your project.
We identify the North location and number the shots(locations).
We utilize a proprietary magnet and gauss meter to verify x-y location on the bottom of the slab for best film placement.
Radiation barriers are set up to protect the general public.
X-rays are taken of each location.
Film is processed in our mobile darkroom.
We layout the findings on the slab.
What You Need To Do
Mark the location(s) you wish to core, drill or saw-cut.
Provide access to both sides of concrete if suspended slab.
Ensure gamma radiography is allowed for use on your project.
Call one of our offices to schedule the job.
Layout Example
Click for Full Image
Sample Report
Should your project require a report, we can take digital photos of the project site and the radiograph and provide a brief narrative of the findings. Then we can print or email the report to your desired contacts or save the data to a CD for your archives.